OSES THREE PHASE OPERATOR MANUAL - EN
Issue No: AE/OSES-3P/TP/07/2011
- Page 7 of 37-
2. SAFETY NOTE
2.1 INTRODUCTION
These instructions are addressed to the Installer and End User / Operator of the OSES
Series of Three Phase AC Voltage Stabiliser / Regulator. We strongly suggest you
keep this manual next to the Stabiliser for future reference.
2.2 GENERAL – INSTALLATION & USAGE
Do not use the Stabiliser for other than the intended use.
Do not install stabiliser in a backfeed circuit to the grid, input voltage supply
cannot be connected to the output of stabiliser
If on delivery there is evidence of visible damage, do not attempt to install or start
the Stabiliser. Advise the transport delivery company and inform Ashley-Edison,
or the resale partner from whom you purchased the equipment.
The Stabiliser can contain potentially dangerous voltages – up to 600 V AC. Use
extreme caution when opening the covers and do not leave the unit unattended
with the doors open or covers off.
Hazardous voltages can be present at the unit’s output any time AC input power
is applied. To avoid possible personal injury, or equipment damage, and to make
certain there is no output voltage, turn the unit off and disconnect the AC Input.
Do not allow liquids or foreign objects to enter the unit.
The installation and use of this product must comply with all relevant current
electrical installations that are in force in the territory of installation.
Only qualified electrician shall install the equipment. The electrician shall install
the AC input according to the instructions contained in this manual. Standard
safety practices should be followed at all times.
The unit must be grounded or earthed at all times when in use.
Do not operate the Bypass Control Switch (or optional inbuilt Manual Bypass
Switch, if fitted) when the Stabiliser is supporting load, as severe damage can be
caused to the equipment and potentially the load. Load to be switched OFF
before operating bypass switches.
If an External Manual Bypass Switch is to be used with the unit, the bypass switch
must be installed according to the Installation Instructions supplied with the
switch. Before operating the switch the input supply should be checked for the
correct phase rotation.